Drukair KB200 Flight Status

Current status of KB200 is Scheduled On time Expected Depart in 7 hours, 27 minutes

KB200 - DRK200 Drukair (KB)
PBH Paro Bhutan
Flight PBH to DEL
DEL Delhi India
Scheduled On time Expected Depart in 7 hours, 27 minutes
Departure Paro Airport
IATA: PBHICAO: VQPR
Scheduled 09:40 09 December 2025
None None
Arrival Indira Gandhi International Airport
IATA: DELICAO: VIDP
Scheduled 11:30 09 December 2025
3 None
KB200 Detail
  • Type: International Flight
  • Flight Duration: 2 hours 20 minutes
  • Flight Distance: 1217 kms / 756 miles
Airline
  • Drukair
  • IATA: KB
  • ICAO: DRK
  • Operating Days: Tuesday, Wednesday, Friday, Saturday, Sunday
Passenger Services
  • Service type: Normal passenger
  • Seats: 124
  • Freight capacity: 6.7 tons
  • Passenger classes: First Class, Economy, Business Class
More Detail
  • Aircraft: Airbus A319
  • Callsign: F-VEPT5
  • Departure Timezone: Asia/Thimphu
  • Arrival Timezone: Asia/Kolkata
  • Current Time in Paro: Tuesday 2025-12-09 02:13 AM
  • Current Time in Delhi: Tuesday 2025-12-09 01:43 AM

International flight Drukair KB200 takes off from Paro (PBH) Bhutan to Delhi (DEL) India. It's operated by Drukair. The plane leaves Paro Airport at 09:40 09 December 2025 Asia/Thimphu. The flight is expected to land at Indira Gandhi International Airport at 11:30 09 December 2025 Asia/Kolkata. The flight will last about 2 hours 20 minutes.

Similar flight route from Paro (PBH) to Delhi (DEL)

Airline Flight no Departure Arrival
Drukair KB202
Drukair
09/12/2025
11:30
2 hours 2 minutes
13:20
Bhutan Airlines B3750
Bhutan Airlines
09/12/2025
None

12:20

Frequently asked questions, answered

What is the scheduled flight duration for Drukair KB200 flight?

On average, nonstop flight takes 2 hour(s) 20 minutes, with the flight distance of 1217 km (756 miles).

What is the current status of Drukair KB200 flight?

The current status of flight Drukair KB200 is Scheduled On time.

What type of aircraft is used for the Drukair KB200 flight?

All Drukair KB200 flights are operated using Airbus A319 aircraft.

When does the flight Drukair KB200 arrive?

Flight Drukair KB200 arrives at 11:30.

Which terminal the flight Drukair KB200 is arriving at?

Flight Drukair KB200 arrives in Indira Gandhi International Airport at Terminal 3.

How many Drukair KB200 flights are operated a week?

5 flights per week. The Flight Drukair KB200 is operated on Tuesday, Wednesday, Friday, Saturday, Sunday.