Azerbaijan Airlines J259 Flight Status from Baku to Mumbai, India today

International flight Azerbaijan Airlines J259 from Baku (GYD) Azerbaijan to Mumbai (BOM) India operated by Azerbaijan Airlines. Scheduled time of departure from Heydar Aliyev International Airport is 21:10 28 April 2024 Asia/Baku and scheduled time of arrival in Chhatrapati Shivaji International Airport is 03:05 29 April 2024 Asia/Kolkata. The duration of the flight is 4 hours 25 minutes.

J259 - AHY59 Azerbaijan Airlines (J2)
GYD Baku Azerbaijan
Flight GYD to BOM
BOM Mumbai India
Departed On time Estimated Arrival in 2 hours, 6 minutes
Departure Heydar Aliyev International Airport
IATA: GYDICAO: UBBB
Scheduled 21:10 28 April 2024
Actual 21:07 28 April 2024
1 None
Arrival Chhatrapati Shivaji International Airport
IATA: BOMICAO: VABB
Scheduled 03:05 29 April 2024
Estimated 02:54 29 April 2024
2 None
J259 Detail
  • Type: International Flight
  • Flight Duration: 4 hours 25 minutes
  • Flight Distance: 3218 kms / 1999 miles
Airline
  • Azerbaijan Airlines
  • IATA: J2
  • ICAO: AHY
  • Operating Days: Thursday
Passenger Services
  • Service type: N/A
  • Seats: N/A
  • Freight capacity: N/A
  • Passenger classes: N/A
More Detail
  • Aircraft: Airbus A320neo
  • Callsign: N/A
  • Departure Timezone: Asia/Baku
  • Arrival Timezone: Asia/Kolkata
  • Current Time in Baku: Sunday 2024-04-28 23:18 PM
  • Current Time in Mumbai: Monday 2024-04-29 00:48 AM

Azerbaijan Airlines J259 flight status on other days

Similar flight route from Baku (GYD) to Mumbai (BOM)

Airline Flight no Departure Arrival
Silk Way West 7L3319
Silk Way West
28/04/2024
06:30 (+4:00)
2 hours 24 minutes
12:00 (+5.5:30)
Silk Way West 7L3321
Silk Way West
28/04/2024
06:05 (+4:00)
2 hours 23 minutes
11:34 (+5.5:30)
Silk Way West 7L3329
Silk Way West
28/04/2024
02:27 (+4:00)
4 hours 1 minutes
None (+5.5:30)
Silk Way West 7L3339
Silk Way West
28/04/2024
04:30 (+4:00)
4 hours 12 minutes
10:00 (+5.5:30)
Aerotranscargo F5705
Aerotranscargo
28/04/2024
07:22 (+4:00)
3 hours 51 minutes
None (+5.5:30)
Azerbaijan Airlines J25003
Azerbaijan Airlines
28/04/2024
19:50 (+4:00)
4 hours 25 minutes
01:45 (+5.5:30)
Silk Way West 7L3379
Silk Way West
28/04/2024
07:00 (+4:00)
2 hours 16 minutes
12:18 (+5.5:30)
Silk Way West 7L6611
Silk Way West
28/04/2024
07:00 (+4:00)
2 hours 20 minutes
12:24 (+5.5:30)

Frequently asked questions, answered

How long is the flight from Baku to Mumbai?

On average, nonstop flight takes 4 hour(s) 25 minutes, with the flight distance of 3218 km (1999 miles).

What type of aircraft is used for the Azerbaijan Airlines J259 flight?

All Azerbaijan Airlines J259 flights are operated using Airbus A320neo aircraft.

Which terminal the flight Azerbaijan Airlines J259 is arriving at?

Flight Azerbaijan Airlines J259 arrives in Chhatrapati Shivaji International Airport at Terminal 2.

How many Azerbaijan Airlines J259 flights are operated a week?

1 flights per week. The Flight Azerbaijan Airlines J259 is operated on Thursday.